Select Language
-
English
-
German
-
French
-
Spanish
-
Italian
-
Portuguese

ESB00163B
Manufacturer: CAMTEC
(12 reviews)
Description:
The ESB00163B is industrial rated peak current inrush limiter for high loads in LED-applications, complex automation systems and in the machine building. This product offers effective and interference free operation with capacitive loads. It is self- powering and does not require an external power supply. The units feature an integrated phase controller. It allows to monitor each AC line independent from each other. Also, each AC line is being limited independent from each other. The units allow precise accurate repeatable limiting of the peak inrush. This protects the installed circuit breakers from tripping accordingly.
Features
Wall mount
Integrated bypass relay
Integrated over temperature protection
At PARTS HUB LLC, we supply not only CAMTEC products but also products from many other brands. We offer a wide range of products to provide the best solutions for our customers' needs. For more detailed information about the CAMTEC - ESB00163B product, please make a request immediately. If you would like to request a different product, request offer or send an email to info@usapartshub.com.
Product | Description | Delivery Time |
---|---|---|
CAMTEC UMS00100.80TSF(R2) | Features Parallel operation N+1 power increase Spring-type terminals 25 mm²/ … | 3-6 Weeks |
CAMTEC ESB001.24.230VAC | The ESB001.24.230VAC is a budget-priced inrush peak current limiter for … | 2-3 Weeks |
CAMTEC ESB101.05UPS(R2) | The 3041081009CA is a budget-priced inrush peak current limiter for … | 3-4 Weeks |
CAMTEC ESB001.LED.230VAC | The ESB001.LED.230VAC is a budget-priced inrush peak current limiter for … | 3-4 Weeks |
CAMTEC ESB00163A | The 3041099011CA is industrial 3-phase rated peak current inrush limiters … | 3-5 Weeks |
CAMTEC ESB303.LED.200/400(R2) | The ESB303.LED.200/400(R2) is a budget-priced inrush peak current limiter for … | 3-4 Weeks |
CAMTEC ESB101.LED.115VAC(R2) | The 3041081006CA is a budget-priced inrush peak current limiter for … | 2-3 Weeks |